Return to
Home
Affiliate Sites Search
Contact Fran├žais

Burnfoot North (Burnfoot Hill facility ext.)

Installed capacity:4.1 MW
Number of turbines:2
Commissioning:2014

Located in central Scotland, the Burnfoot North wind farm (4.1 MW) is comprised of two Senvion wind turbines. It is the first out of three extensions added to Burnfoot Hill, originally built in 2010 by EDF Energy Renewables.

As a whole, the Burnfoot facility (41.3 MW) corresponds to the annual energy needs of around 23,000 Scottish households.